Vacuum freeze-drying relies on high vacuum condition to realize direct sublimation of ice crystals inside materials. Once the equipment has air leakage points, external air continuously infiltrates into the drying chamber. The vacuum system needs to keep running at high load to maintain the target vacuum value. Insufficient vacuum will slow down the sublimation rate obviously. Materials are prone to local melting, shrinkage and collapse, leading to unqualified finished product texture and greatly increased reject rate. In serious cases, the whole batch of raw materials will be wasted.

Most vacuum leakage failures originate from the sealing system. The main vulnerable parts include drying chamber door silicone sealing strip, pipeline flange sealing gaskets, vacuum valve sealing rings, dynamic shaft seals of turnover mechanisms. These rubber polymer components work alternately under low temperature, normal temperature and pressure change environment for a long time. After long-term operation, problems such as hardening, cracking, deformation, surface adhesion of material residues will gradually appear. Tiny gaps formed by these defects become channels for air infiltration.

Enterprises should formulate regular inspection cycles for sealing components. Before each production batch, operators need to check whether the door sealing strip is in good condition, clean pulp debris, grease and other residues attached to the surface. Foreign matters stuck between the sealing surface and the rubber strip will cause incomplete compression and permanent indentation of the sealing strip. If hardening, cracks and elastic loss are found, replace accessories in time instead of continuing production.

For equipment with obvious vacuum drop, standardized leak detection work should be carried out. Common detection methods include static vacuum holding test, spray leak detector inspection. After the freeze-drying chamber is closed and pumped to the target vacuum, cut off the vacuum system and record the vacuum rising speed. If the pressure rise exceeds the standard range, it proves that there is obvious leakage. Then focus on checking the door frame, each flange connection, valve parts. It is worth noting that excessive force when closing the door will cause permanent deformation of the sealing strip; appropriate clamping force should be kept according to equipment requirements.

Many factories only replace accessories after serious leakage occurs, which brings intermittent quality fluctuation risks in production. Daily maintenance can prolong the service life of sealing parts. Avoid using corrosive cleaning agents to scrub rubber seals; prevent long-term direct contact with grease and acidic material juice. For long-term shutdown equipment, keep the door slightly open to avoid long-term compression deformation of the sealing strip.

Good sealing management can maintain stable vacuum performance of freeze dryer, guarantee consistent drying cycle of each batch of materials, control unit energy consumption within the expected range, and reduce unnecessary production loss for freeze-dried food processing enterprises.